Intermatic RC613L Wireless Modular Radio Receiver with 36" Long Leads (00078275071803) Reviews

Intermatic RC613L Wireless Modular Radio Receiver with 36" Long Leads (00078275071803)

|Write a Review
Share This!
  Ask friends for feedback
Compare Prices (See All Offers)
 
 
Amazon
 
$87.75 
104.14
 
Amazon Marketplace
 
eBay
Why are these stores listed?
Product Details
These Modular Radio Receivers are one half of a two part remote control system. They operate as ordinary ON/OFF switches but they also respond to the signals of a hand held transmitter „ the other half of the system. The modules are designed for indoor or outdoor use, and can handle a variety of switching applications, typical around the house or farm. By the push of a button on the face of the transmitter, the user is able to turn ON-OFF the connected load (lights, pump, etc.) from any remote location, inside or outside of the house, safely and conveniently. In addition, a single transmitter can operate up to three receivers and is able to ñteachî each module a different code (Transmitter model RC939 sold separately).SpecificationsIncludes Single Channel Receiver with Three 36" Leads, needs RC939 Radio TransmitterEnclosure: Beige outdoor grade plastic.Maximum Range: 100 ft.
Key Features
Brand: Intermatic
Miscellaneous
Product ID: 106567529